Bathrooms and wet rooms

Bathrooms and wet rooms, plumbed properly from first fix to final fit-off.

We carry out the complete first-fix and second-fix plumbing for new bathrooms and wet rooms, and Will organises the other trades on the job.

A new bathroom can look perfect and still be leaking behind the tiles.

The pipework that goes in before the walls and floor are finished is called the first fix. Once the tiles are on you can’t see it, so it has to be right before it’s covered.

From the initial pipework through to the final fit-off, we complete every stage with care and attention to detail.

Bathroom wall studwork with copper and plastic pipes feeding a shower valve, before the boards and tiles go on
  • Wet room under a sloping ceiling with a black shower riser, a tiled niche, a black towel radiator and a grey non-slip floor
  • The same wet room from above: a black vanity unit with a white basin, a back-to-wall toilet and the floor drain
A wet room. The complete first-fix and second-fix plumbing for a new wet room, working alongside Woodtech Construction for a returning customer: from the first pipework to the final fit-off.

Then the part you do see

Second fix is the fit-off: connecting up the shower, basin, toilet and everything else once the room is finished.

Our work

A family bathroom and matching shower room

The same finishes in both rooms: marble-effect wall tiles, wood-effect flooring, brushed brass fittings, floating vanity units and a walk-in shower.

  • Family bathroom with a freestanding bath, a walk-in shower, a floating vanity unit and a wood-effect floor
  • Floating vanity unit with a brass tap beside the toilet and a column radiator
  • Walk-in shower with a brushed brass rain shower and a tiled niche
  • Shower room with a brass-framed shower enclosure and a matching vanity unit

How we run the job

The trades

Organised by Will

A bathroom needs more than a plumber. Will organises the other trades, so the job is looked after from start to finish.

The pipework

Planned and sized to suit

Pipework is planned carefully, installed neatly and sized correctly for the system.

Your home

Kept tidy while we work

Floor protection, dust control and cleaning as we go are part of the job.

[PRICE GUIDE FOR BATHROOMS AND WET ROOMS, INCLUDING VAT, TO BE ADDED ONCE CONFIRMED]

Planning a bathroom or wet room?

Tell us about the room and what you have in mind. We’ll come and look, then send you a written quote.

Get a free quote
Call 07958 449008
To supply: 23

Website review. Anything [HIGHLIGHTED LIKE THIS] on a page is still needed, and so is everything below. Send it to us and we’ll add it.

Every page (footer)

  • VAT number. And whether the company is VAT registered (the About page says it is).
  • Instagram link. The address of the business’s Instagram account.

Home

  • Photo wanted: wall chasing. A wall chaser in use with the dust extractor attached and the operator wearing a mask. Hidden until there is one.

Boilers

  • Warranty details. Which warranty length (5, 7 or 10 years) applies to which boiler, and the conditions.
  • Price guide. Boiler prices including VAT, and what each includes.
  • Photo wanted: back boiler conversion. An old back boiler, and the new boiler that replaced it. Hidden until there is one.
  • Photo wanted: wall chasing. As on the Home page.

Bathrooms & wet rooms

  • Price guide. Bathroom and wet room prices including VAT.

Servicing & plumbing

  • Service price. The annual service price, including VAT.
  • Plumbing jobs. Examples of the plumbing jobs Will wants to be called for.

Advice

  • Photo wanted: Benchmark checklist. A completed checklist with every customer detail hidden. Hidden until there is one.
  • Photo wanted: back boiler conversion. As on the Boilers page.
  • Please confirm: CO alarm photo. Guide 4 shows a Baxi 400 with an alarm above it. Is that a carbon monoxide alarm?

About

  • Please confirm: team photo. Everyone in the team photo has agreed to it being used.
  • VAT number. As in the footer.

Contact (questions)

  • Price guide. For “How much will it cost?”.
  • Workmanship guarantee. Whether there is a written guarantee on Will’s own work, what it covers and for how long.
  • Deposit and payment terms. For “Do I have to pay a deposit?”.

Help centre

  • 11 guides to write. Each needs Will’s input, and his review before it goes live.
  • Please check: the two diagrams. The radiator and pressure gauge drawings under “See it for yourself” give safety advice, so Will should check them. The gauge says “If you’ve overfilled it, ring us” above 2 bar.
  • Frozen pipe guide: Will’s review. Will to read the guide and give the date he reviewed it.
  • Frozen pipe guide: fault codes. The fault codes for the boilers Will fits.
  • Frozen pipe guide: photo or video wanted. Will pointing out the condensate pipe on an outside wall and pouring warm water over it. Hidden until there is one.